4C
The test of a good problem statement: Clarity, Consequence, Cause, Confirmation.
6W
The six questions a problem statement should answer: what, where, when, who, why it happens, why it matters.
CLARA
DSTA's AI product-intelligence tool, the hub for the prompt library.
DASH
DSTA's measurement platform for UX, product and capability metrics.
DSTA
Defence Science and Technology Agency.
Fitness assessment
A five-dimension score of how fit for purpose a product is.
Flywheel
The ProductOps operating loop: Research, then Design and Test.
FSD
Full scale development. Building the product out at scale once its value is proven.
IMPACT
The modernisation framework: Identify, Map, Phase, Assemble teams, Change management, Top-level ownership.
Leading indicator
An early behaviour change that validates part of the theory of change.
METRIC
The value framework: Map, Establish, Track, Review, Institutionalise, Commit.
MPO
MINDEF Product Office.
North Star metric
Another name for the value metric.
OM
Ops Manager. The accountable operational owner of a product's outcome.
OTI
Ops-Tech Integration. Operations and technology aimed at one outcome.
PRIZM
DSTA's AI-ingestible design system. This playbook is built on it.
Product Lead
The senior product role in the Working Committee; partners the OM two-in-a-box.
Product Manager
The product role running delivery inside a squad.
Programme Lead
The senior programme role in the Working Committee; a peer of the Product, Tech and Design Leads.
Programme Management
The function that coordinates delivery across the squads of a product: workstreams, funding, procurement, dashboards and user support.
Programme Manager
The programme role running procurement, dashboards and user support for one workstream.
ProductOps Pipeline (enterprise)
DSTA's organisation-wide product capability, standards and toolchain.
Proof of concept (PoC)
The first stage: proving the thing can be built and put in front of real users.
Proof of value (PoV)
The second stage: proving the value metric can actually move.
RACI
Who is Responsible, Accountable, Consulted and Informed for each activity in a product team.
SFR
The prioritisation test for problem statements: Severity, Frequency, Reach, each scored low, medium or high.
Squad
The delivery team: PM, Engineering Manager, Designer and engineers.
SMART
The test of a value metric: specific, measurable, achievable, relevant, time-bound.
Steering Committee
The oversight body that holds the OM accountable, vests the levers and clears blockers.
Strangler fig
A gradual modernisation strategy that replaces a system piece by piece.
TEAM
The team principle, and the first-steps mnemonic: Target, Evaluate, Assemble, Mobilise.
TEST
The testing framework: Trial with real operators, Expose the riskiest assumption, Shorten the loop, Turn tests into decisions.
Theory of change
The causal chain from what you build to the outcome you seek.
Two-in-a-box
The joint OM and Product Lead ownership pairing.
Value metric
A leading indicator that directly measures the outcome of solving the problem.
Value-Cost Ratio
Outcome delivered per dollar spent; its year-on-year change is the key signal.
Working Committee
The body that runs the product: the OM and Product Lead two-in-a-box, plus the Leads.